Secondary Treatment Wastewater Systems in Northland

Duracrete CleanStream and Hynds secondary treatment systems, supplied and installed by a certified installer, for sites where a standard septic tank won’t do.

  • Certifying drainlayer
  • Certified Hynds and Duracrete installer
  • Free quotes in Whangarei
Duracrete CleanStream secondary treatment system being lowered into an excavated hole during installation in Northland
Certified Duracrete and Hynds installer

When a standard septic tank isn’t enough

A standard septic tank separates solids from the liquid, then relies on the soil in the disposal field to finish the job. On a large, flat section with free-draining soil, that works well. Sloping sites, heavy clay, small sections and homes close to streams or the coast often need wastewater treated to a much higher standard before it goes back into the ground.

A secondary treatment system adds extra treatment stages inside the tank, so bacteria break down far more of the waste before the water leaves. The water that comes out is clear, low in odour and much safer for the ground and nearby waterways. We supply and install secondary treatment systems across Northland, and we’re a certified installer for both Duracrete and Hynds.

When you need one

Your wastewater engineer decides which system your site needs, based on a site assessment and soil tests. The Regional Plan for Northland sets the conditions for on-site wastewater, and several of them favour secondary treatment on difficult sites:

On a tight or sloping section, those differences can decide whether a system fits at all. If your engineer has specified secondary treatment, these rules are usually the reason. We’re happy to talk it through once you have your design.

Sloping sites wastewater irrigated onto slopes steeper than 10 degrees must have at least secondary treatment
Closer to water the setback from streams, wetlands and the coast is 15 metres, compared with 20 metres for a standard septic tank
High water tables the gap to the winter groundwater table can be 0.6 metres instead of 1.2 metres
Smaller reserve area the spare disposal area needs to be 30 percent of the main one, instead of 100 percent

The systems we install

Duracrete CleanStream TXR

This is the system we install most. CleanStream is made by Whangarei-based Duracrete and treats wastewater through a series of chambers and a textile media filter, rather than relying on an air blower running all the time. Duracrete says the pump runs for 30 seconds, four times an hour, and costs around 32 cents a day in power. The system also has built-in emergency storage in case of a pump fault or power cut, and an alarm to let you know if something needs attention.

Hynds

We're also a certified Hynds installer and put in Hynds secondary treatment systems where the design calls for them. Hynds systems use aerated treatment, where air is added to help bacteria break down the waste. Some Hynds systems also have a holiday setting for homes that are used part-time.

Both systems finish with a pump that sends the treated water to shallow irrigation lines, usually drip irrigation under topsoil, mulch or bark. Because of that pump, a secondary treatment system needs a power supply, and the power needs to stay on for it to work properly. Any hard-wiring is done by a licensed electrician, and we can arrange one or work with your own.

What affects the price

Every site is different, so we quote each job individually. The main things that affect the price are:

  1. 01 System size larger households need larger systems
  2. 02 Site access whether a truck and digger can get close to where the tank is going
  3. 03 Irrigation area the size and layout your design calls for
  4. 04 Slope and ground conditions steep sites, clay and rock all add to the work
  5. 05 Location travel time for sites further from Whangarei

Quotes are free in Whangarei and the surrounding area. For remote Northland sites, we offer a drainage report for $499 + GST, which gives you a clear picture of what’s needed before any work starts. Either way, you’ll know what the job involves before you commit.

From design to sign-off

  1. 1
    Get in touch Call us, or send the form below with photos of the site and your plans if you have them.
  2. 2
    Site design A wastewater engineer assesses the site and designs the system, if that hasn't already been done.
  3. 3
    Quote We quote the job based on the approved design.
  4. 4
    Consent The design goes to your district council for building consent, plus a resource consent from Northland Regional Council if your site needs one.
  5. 5
    Installation We install the tank and irrigation lines to the approved design.
  6. 6
    Sign-off Council inspects the work and we provide the certification needed for sign-off.

Servicing and upkeep

Secondary treatment systems need regular servicing by trained technicians. Duracrete requires CleanStream systems to be serviced every 12 months, or every six months where the system handles higher flows, and Hynds recommends a service every six months. Servicing is usually arranged through the manufacturer’s own service agents when you buy the system, and Duracrete has its own team of service technicians.

The Regional Plan for Northland requires on-site systems to be maintained to the manufacturer’s specifications. In Kaipara, the district council’s bylaw also requires aerated systems to be inspected every year. Drainspec installs the system but doesn’t do the servicing, so the service agent looks after that side.

Between services, leave the power on, only flush toilet paper and keep fats, oils and harsh chemicals out of the drains. If the alarm goes off, call your service agent rather than ignoring it. Keeping a record of each service also makes it easy to show the system has been looked after if you ever sell.

Why choose Drainspec

One team from start to finish We quote the job, install the system and sign it off.
Experienced and certified Our certifying drainlayer has over 25 years in the trade, and Drainspec is a certified Hynds and Duracrete installer.
Local knowledge We know Northland's soils, slopes and council requirements.
Workmanship promise If there's ever a problem with our work, we'll come back and fix it.

Secondary treatment FAQs

Can’t see your question? Call us on 021 0236 9667.

Your wastewater engineer will decide, based on your site, your soil and the Regional Plan’s conditions. It’s required where wastewater is irrigated onto slopes steeper than 10 degrees, and it’s often the best option on small sections, heavy clay or sites close to water. If you already have a design, it will say which system you need.

Yes, an existing septic tank can be upgraded to secondary treatment. Whether that’s the best option depends on the age and condition of your tank and what your wastewater design requires. We can look at your setup and talk you through it.

Yes, and you should leave the power on while you’re away, so the system keeps working as it should. Some Hynds systems also have a holiday setting for homes that are used part-time. Our bach septic page covers this in more detail. Bach septic systems →

No, Drainspec doesn’t offer servicing. The manufacturer’s service agents usually look after that, and it’s normally set up when you buy the system. If a service turns up a problem with the installation, we’ll come back and fix it.

Get a free quote

Tell us about your property and what you need, whether it’s a new system, an upgrade or a replacement. If you have a wastewater design or building plans, send them through with a few photos of the site.

We reply to every enquiry within one working day.

Prefer to talk? Call us on 021 0236 9667 ben@drainspec.co.nz
Back to top